Dreamee™ Smart 4G GPS Pet Tracker for Dogs & Cats | Real-Time Location Tracking & Escape Alerts
M10 Smart Pet GPS Tracker — Product Description
M10 Smart Pet GPS Tracker is a professional-grade 4G pet tracking device designed for dogs and cats. Combining 4G LTE communication, GPS + BeiDou + WiFi + LBS multi-mode positioning, and an intelligent mobile app, it provides real-time location tracking, geo-fence protection, activity monitoring, and historical route playback to help pet owners keep their pets safe anytime, anywhere.
Key Features
4G LTE Real-Time Tracking
- Equipped with a new-generation 4G communication chip
- Fast location updates with stable signal transmission
- Supports worldwide 4G networks for reliable connectivity
Multi-Mode Accurate Positioning
- GPS satellite positioning
- BeiDou satellite positioning
- WiFi positioning
- LBS base station positioning
- Automatic switching between positioning modes for improved accuracy in complex environments
Electronic Geo-Fence Protection
- Create customized safe zones through the mobile app
- Instant alerts when pets leave or enter designated areas
- APP notifications, SMS, and call alerts available
- One-click navigation to your pet's location
Historical Route Playback
- View pet movement history anytime
- Track daily activity habits and exercise routes
- Useful for locating lost pets and reviewing movement records
IP68 Waterproof & Dustproof
- Fully sealed waterproof construction
- Resistant to rain, splashes, mud, and swimming
- Suitable for outdoor adventures and daily use
Magnetic Fast Charging
- Convenient magnetic charging design
- Quick charging with longer usage time
- Secure charging interface with enhanced durability
Comfortable Reflective Collar
- Double-loop anti-slip design for secure attachment
- Adjustable reflective collar up to 77 cm
- Improved visibility during nighttime walks
Smart Mobile App
- Supports 100+ languages
- Compatible with multiple domestic and international maps
- Real-time location monitoring
- Activity tracking and step statistics
- Easy setup and user-friendly operation
Technical Specifications
| Item | Specification |
|---|---|
| Model | M10 |
| Network | LTE 4G |
| Positioning | GPS / BDS / WiFi / LBS |
| Working Voltage | 3.3V – 4.2V DC |
| Charging Voltage | 5V DC |
| Device Weight | 43g |
| Total Package Weight | 113g |
| Device Size | 63 × 40 × 22 mm |
| Package Size | 120 × 80 × 50 mm |
| Charging Method | Magnetic Charging |
| Waterproof Rating | IP68 |
Package Contents
- M10 Smart Pet GPS Tracker ×1
- Adjustable Reflective Collar ×1
- Magnetic Charging Cable ×1
- SIM Card Slot Tool / Screwdriver ×1
- User Manual ×1
- Retail Packaging Box ×1
Marketing Summary
M10 Smart Pet GPS Tracker
Fast. Accurate. Reliable.
Featuring 4G connectivity, multi-mode positioning, geo-fence alerts, route history, and IP68 waterproof protection, the M10 delivers professional-level pet safety and location tracking. Whether at home, in the city, or outdoors, you can always know where your pet is and respond immediately when needed. Perfect for dog owners, cat owners, breeders, pet stores, distributors, and cross-border e-commerce sellers. CCC certificate: 2024231606004167
You may also like
Real-Time GPS Tracking for Your Pet
Know where your pet is at all times. Dreamee™ 4G GPS Tracker sends instant escape alerts straight to your phone.














